D1 Traffic Calming Project - Group 2

Project Number: 40-B253611

Current Project Status:

Design.

Project Scope:

10 locations for the installation of rubberized speed cushions. Includes milling and resurfacing in 4 locations.

Estimated Costs:

$160,000.00

Project Locations:

#22: NW 12 Ter from NW 36 Ave to NW 37 Ave 
#24: NW 13 St from NW 36 Ave to NW 37 Ave 
#31: NW 28 Ave from NW 7 St to NW 9 St 
#34: NW 30 Ct from NW 7 St to NW 11 St 
#37-D: NW 32 Ave between NW 14 St and NW 14 Terr 
#41: NW 32 Ct from NW 9 St to NW 11 St 
#42: NW 33 Ave from NW 7 St to NW 9 St 
#43: NW 33 Ave from NW 9 St to NW 11 St 
#46: NW 35 Ave from NW 9 St to NW 11 St 
#64: NW 32 Ave between NW 15 St and 16 St 

Road Closures:

Some road closures may be necessary during construction; however, they will be carefully planned and sequenced to minimize inconvenience and ensure continued access for residents.

Construction Schedule:

The timeline provided is an estimate and may change due to weather conditions or other unforeseen circumstances.

  • Construction Start Date: October 2026
  • Construction End Date: November 2026