D1 Traffic Calming Project - Group 2
Project Number: 40-B253611
Current Project Status:
Design.
Project Scope:
10 locations for the installation of rubberized speed cushions. Includes milling and resurfacing in 4 locations.
Estimated Costs:
$160,000.00
Project Locations:
#22: NW 12 Ter from NW 36 Ave to NW 37 Ave
#24: NW 13 St from NW 36 Ave to NW 37 Ave
#31: NW 28 Ave from NW 7 St to NW 9 St
#34: NW 30 Ct from NW 7 St to NW 11 St
#37-D: NW 32 Ave between NW 14 St and NW 14 Terr
#41: NW 32 Ct from NW 9 St to NW 11 St
#42: NW 33 Ave from NW 7 St to NW 9 St
#43: NW 33 Ave from NW 9 St to NW 11 St
#46: NW 35 Ave from NW 9 St to NW 11 St
#64: NW 32 Ave between NW 15 St and 16 St
Road Closures:
Some road closures may be necessary during construction; however, they will be carefully planned and sequenced to minimize inconvenience and ensure continued access for residents.
Construction Schedule:
The timeline provided is an estimate and may change due to weather conditions or other unforeseen circumstances.
- Construction Start Date: October 2026
- Construction End Date: November 2026