NW 17 Street Roadway Improvements
Two Roadway Improvements in the Grapeland Neighborhood on NW 17 Street in City of Miami, District 1

Project Number: 40-B183611A (Phase I) / 40-B183611 (Phase II)
Current Project Status:
40-B183611A Bidding Phase, 100% plans approved in May 2025.
40-B183611 Design Phase, Typical Section Package.
Project Scope:
Design and construction of roadway and stormwater infrastructure improvements including roadway reconstruction, curbs, sidewalks, swale regrading / sodding, driveways approaches, ADA ramps, on-street parking, drainage system, and signage and pavement markings. This project also includes a Joint Participation Agreement (JPA) with Miami-Dade Water and Sewer (MDWASD) for the installation of an 8-inch water main, fire hydrants, and water services.
Project Phases:
Phase I (40-B183611A): From NW 32 to NW 37 Avenue.
Phase II (40-B183611): From NW 27 to NW 32 Avenue.
Project Cost Estimate:
40-B183611A: $7,473,497
40-B183611: $7,696,320
Project Benefits and Impacts:
- Number of properties impacted: Total = 139 (106 Residential and 33 Non-Residential)
- Total property value protected: $82M
Project Boundaries:
- 40-B183611A - NW 17 Street between NW 32 Avenue and NW 37 Avenue
- 40-B183611 - NW 17 Street between NW 27 Avenue and NW 32 Avenue

Road Closures:
Some road closures may occur during construction but will be sequenced appropriately to minimize disruption to the residents.
Estimated Construction Timeline:
Subject to change.
- Estimated Construction Start:
Phase 1 - Summer 2026
Phase 2 - Winter 2027
- Estimated Construction End:
Phase 1 - Summer 2027
Phase 2 - Winter 2028