Shoreline Repair Mini Rapids Park

Project Number: 40-B253603

Current Project Status (September 2025):

A/E Selection.

Project Scope:

Design and construction of improvements to stabilize short segments of the shoreline along the Miami River which will be treated as emergency type repairs.

Project Cost Estimate:

$1,338,375

Project Boundaries:

The project limits are bounded by

First location is approximately 200ft along the NW S River Drive embankment on the south side of the Miami River in front of the Miami River Rapids Mini Park.

Second location is approximately 60ft along the NW N River Drive embankment on the north side of the Miami River where NW N River Drive intersects with NW 25 Ave.

Map illustrating the project boundaries of 40-B253603 (along NW S River Drive embankment)

Map illustrating the project boundaries of 40-B253603 (along NW N River Drive embankment)

Road Closures:

Some road closures may occur during construction but will be sequenced appropriately to minimize disruption to the residents.

Estimated Construction Timeline:

  • Estimated Construction Start: Winter 2027
  • Estimated Construction End: Fall 2027