Shoreline Repair Mini Rapids Park
Project Number: 40-B253603
Current Project Status (January 2026):
Professional Services (Design and Survey).
Project Scope:
Design and construction of improvements to stabilize short segments of the shoreline along the Miami River which will be treated as emergency type repairs.
Project Cost Estimate:
$1,625,875
Project Boundaries:
The project limits are bounded by:
First location is approximately 200ft along the NW S River Drive embankment on the south side of the Miami River in front of the Miami River Rapids Mini Park.
Second location is approximately 60ft along the NW N River Drive embankment on the north side of the Miami River where NW N River Drive intersects with NW 25 Ave.


Road Closures:
Some road closures may occur during construction but will be sequenced appropriately to minimize disruption to the residents.
Construction Schedule:
The timeline provided is an estimate and may change due to weather conditions or other unforeseen circumstances.
- Construction Start: May 2027
- Construction End: January 2027