Traffic Calming Devices NW 15 Ave between NW 7 Street and NW 9 Street

Project Number: 40-B243607
Current Project Status (May 2026):
Construction.
Project Scope:
Assessment of two locations for geometric fit for trafic calming device installations; design and construction of one raised intersection at the eligible location.
Estimated Costs:
$721,366
Project Boundaries:
The project limits are bounded by NW 15th Avenue and NW 8th Terrace Raised intersection (by City) and All-Way Stop Condition by MDC-DTPW.

Road Closures:
Some road closures may occur during construction but will be sequenced appropriately to minimize disruption to the residents.
Construction Schedule:
The timeline provided is an estimate and may change due to weather conditions or other unforeseen circumstances.
- Construction Start Date: April 2026
- Construction End Date: October 2026