Wagner Creek Embankment Stabilization

Project Number: 40-B243800
Current Project Status (January 2026):
Design.
Project Scope:
Design and construction of improvements to stabilize the Wagner Creek embankments from NW 20 Street to NW 19 Street, and associated right-of-way improvements. The work includes stabilizing the embankments using sheet piling and geowebs/geocells, dredging, installing tidal valves and manatee grates, roadway reconstruction, sidewalks, landscaping, and lighting.
Project Phases:
Phase 1 - Canal Dredging. Emergency repair along Wagner Creek on both sides, near NW 20 St including canal stabilization and dredging.
Phase 2 - Remaining canal stabilization, dredging and roadway improvements.
Project Cost Estimate:
$16,096,190
Project Boundaries:
The project limits are bounded by
Embankments along Wagner Creek from NW 20 Street to NW 19 Terr.
Embankment along Wagner Creek from NW 19 Terrace to NW 19 Street.
Walkway west side of Wagner Creek Canal (from NW 20 Street to NW 15 Ave).
Improve sidewalk areas on east side adjacent to impacted by shoreline stabilization improvements from NW 15 Avenue to NW 19 Terrace.

Road Closures:
Some road closures may occur during construction but will be sequenced appropriately to minimize disruption to the residents.
Construction Schedule:
The timeline provided is an estimate and may change due to weather conditions or other unforeseen circumstances.
- Construction Start: July 2027
- Construction End: July 2028