Wagner Creek Embankment Stabilization
Project Number: 40-B243800
Project Scope:
Design and construction of improvements to stabilize the Wagner Creek embankments between NW 20 Street and NW 14 Avenue and associated right-of-way improvements including sidewalks and road reconstruction.
Project Cost Estimate:
$9,662,959
Project Benefits and Impacts:
- Number of properties impacted: Total = 35 (28 Residential and 7 Non-Residential)
- Total property value protected: $32M
Project Boundaries:
The project limits are bounded by Embankments along Wagner Creek from NW 20 Street to NW 19 Terr. Embankment along Wagner Creek from NW 19 Terrace to NW 19 Street. Walkway west side of Wagner Creek Canal (from NW 20 Street to NW 15 Ave). Improve sidewalk areas on east side adjacent to impacted by shoreline stabilization improvements from NW 15 Avenue to NW 19 Terrace.

Road Closures:
Some road closures may occur during construction but will be sequenced appropriately to minimize disruption to the residents.
Estimated Construction Timeline:
- Estimated Construction Start: Winter 2027
- Estimated Construction End: Spring 2028
Provide your feedback about this project here