Center Grove/Little Bahamas Traffic Calming

Citizens' Independent Transportation Trust Logo U.S. Department of Housing and Urban Development Logo

Project Number: 40-B253605

Current Project Status (December 2025):

Planning/Design. Please see Project Boundaries section to view each Traffic Control Status.

Project Scope:

Assessment of thirty-four (34) locations for traffic calming device installations; balloting of applicable locations; design and construction of traffic calming devices at eligible locations.

Project Cost Estimate:

$2,225,000 

Project Boundaries:

The project limits are bounded by 

Group 1

10. Oak Ave between Virginia St and Matilda St (Choker) - In Design
13. Oak Ave between McDonald St and Elizabeth St (Speed Hump) - In Design
20. Oak Ave between Douglas Rd and Brooker St (Choker) - In Design
22. Virginia St between Day Ave and Oak Ave (Choker) - In Design
26. SW 28 Ter between SW 27 Ave and S Dixie Hwy (Speed Hump) - In Design
30. McDonald St between Day Ave and oak Ave (Choker) - In Design
32. Mary St between Shipping Ave and Dade Ave (Choker) - In Design
33. Dade Ave between Indiana St and Ohio St (Choker) -In Design

Group 2

1. Day Ave and Virginia St (Raised Intersection) - Pending Traffic Study
2. Day Ave and Matilda St (Textured Pavement) - Pending Traffic Study
3. Day Ave and Mary St (Textured Pavement) - Pending Traffic Study
4. Day Ave and Elizabeth St (Textured Pavement) - Pending Traffic Study
5. Day Ave and Hibiscus St (Raised Intersection) - Pending Traffic Study
6. Day Ave and Plaza St (Textured Pavement) - Pending Traffic Study
7. Day Ave and Douglas Rd - (Not Included – County Road)
8. Oak Ave and Mary St (Textured Pavement) - Pending Traffic Study
9. Oak Ave and Virginia St (Textured Pavement) - Pending Traffic Study
11. Oak Ave and Matilda St (Textured Pavement) - Pending Traffic Study
12. Oak Ave and McDonald St (Textured Pavement) - Pending Traffic Study
14. Oak Ave and Elizabeth St (Textured Pavement) - Pending Traffic Study
15. Oak Ave and Hibiscus St (Textured Pavement) - Pending Traffic Study
16. Oak Ave and Plaza St (Textured Pavement) - Pending Traffic Study
17. Oak Ave and Douglas Rd - (Not Included – County Road)
18. Douglas Rd between Oak Ave and Frow Ave - (Not Included – County Road)
19. Douglas Rd and Florida Ave - (Not Included – County Road)
21. Oak Ave and Brooker St - (Not Included – Out of City limits)
23. Virginia St and Jackson Ave (Textured Pavement) - Pending Traffic Study
24. Virginia St and Trade Ave (Textured Pavement) - Pending Traffic Study
25. Virginia St and Coconut Ave (Textured Pavement) - Pending Traffic Study
27. Shipping Ave and Matilda St (Textured Pavement) - Pending Traffic Study
28. Shipping Ave and McDonald St (Raised Intersection) - Pending Traffic Study
29. McDonald St and Bird Ave (Textured Pavement) - Pending Traffic Study
31. Mary St and Shipping Ave (Raised Intersection) - Pending Traffic Study
34. Elizabeth St between Bird Ave and Shipping Ave (Speed Hump) - Pending Traffic Study

Map illustrating the project boundaries of 40-B253605

Road Closures:

Some road closures may occur during construction but will be sequenced appropriately to minimize disruption to the residents.

Construction Schedule:

The timeline provided is an estimate and may change due to weather conditions or other unforeseen circumstances.

  • Construction Start (Group 1): June 2026
  • Construction End (Group 1): September 2026