Center Grove/Little Bahamas Traffic Calming

Project Number: 40-B253605
Current Project Status (December 2025):
Planning/Design. Please see Project Boundaries section to view each Traffic Control Status.
Project Scope:
Assessment of thirty-four (34) locations for traffic calming device installations; balloting of applicable locations; design and construction of traffic calming devices at eligible locations.
Project Cost Estimate:
$2,225,000
Project Boundaries:
The project limits are bounded by
Group 1
10. Oak Ave between Virginia St and Matilda St (Choker) - In Design
13. Oak Ave between McDonald St and Elizabeth St (Speed Hump) - In Design
20. Oak Ave between Douglas Rd and Brooker St (Choker) - In Design
22. Virginia St between Day Ave and Oak Ave (Choker) - In Design
26. SW 28 Ter between SW 27 Ave and S Dixie Hwy (Speed Hump) - In Design
30. McDonald St between Day Ave and oak Ave (Choker) - In Design
32. Mary St between Shipping Ave and Dade Ave (Choker) - In Design
33. Dade Ave between Indiana St and Ohio St (Choker) -In Design
Group 2
1. Day Ave and Virginia St (Raised Intersection) - Pending Traffic Study
2. Day Ave and Matilda St (Textured Pavement) - Pending Traffic Study
3. Day Ave and Mary St (Textured Pavement) - Pending Traffic Study
4. Day Ave and Elizabeth St (Textured Pavement) - Pending Traffic Study
5. Day Ave and Hibiscus St (Raised Intersection) - Pending Traffic Study
6. Day Ave and Plaza St (Textured Pavement) - Pending Traffic Study
7. Day Ave and Douglas Rd - (Not Included – County Road)
8. Oak Ave and Mary St (Textured Pavement) - Pending Traffic Study
9. Oak Ave and Virginia St (Textured Pavement) - Pending Traffic Study
11. Oak Ave and Matilda St (Textured Pavement) - Pending Traffic Study
12. Oak Ave and McDonald St (Textured Pavement) - Pending Traffic Study
14. Oak Ave and Elizabeth St (Textured Pavement) - Pending Traffic Study
15. Oak Ave and Hibiscus St (Textured Pavement) - Pending Traffic Study
16. Oak Ave and Plaza St (Textured Pavement) - Pending Traffic Study
17. Oak Ave and Douglas Rd - (Not Included – County Road)
18. Douglas Rd between Oak Ave and Frow Ave - (Not Included – County Road)
19. Douglas Rd and Florida Ave - (Not Included – County Road)
21. Oak Ave and Brooker St - (Not Included – Out of City limits)
23. Virginia St and Jackson Ave (Textured Pavement) - Pending Traffic Study
24. Virginia St and Trade Ave (Textured Pavement) - Pending Traffic Study
25. Virginia St and Coconut Ave (Textured Pavement) - Pending Traffic Study
27. Shipping Ave and Matilda St (Textured Pavement) - Pending Traffic Study
28. Shipping Ave and McDonald St (Raised Intersection) - Pending Traffic Study
29. McDonald St and Bird Ave (Textured Pavement) - Pending Traffic Study
31. Mary St and Shipping Ave (Raised Intersection) - Pending Traffic Study
34. Elizabeth St between Bird Ave and Shipping Ave (Speed Hump) - Pending Traffic Study

Road Closures:
Some road closures may occur during construction but will be sequenced appropriately to minimize disruption to the residents.
Construction Schedule:
The timeline provided is an estimate and may change due to weather conditions or other unforeseen circumstances.
- Construction Start (Group 1): June 2026
- Construction End (Group 1): September 2026