District 3 Traffic Calming Studies and Improvements

Citizens' Independent Transportation Trust Logo

Project Number: 40-B243605

Current Project Status (June 2026):

Group 1 is completed!
Group 2 is completed!
Groups 3 in A/E Selection / is completed (Location #6).
Group 4 is completed!
Group 5 in planning / A/E Selection.
Group 6 is completed!
Group 7 is completed!

Project Scope:

Intersection Improvements, traffic calming and speed cushion. Assessment of locations for traffic calming device installations; balloting of applicable locations; design and construction of traffic calming devices at eligible locations.

Estimated Costs:

$3,480,155

Project Boundaries:

The project limits are bounded by

Group 1

1: Intersection and Raised Crosswalk at SW 13th Avenue and SW 16th Street
2: Speed Cushion along SW 20th Street between SW 12th Avenue and SW 13th Avenue

Group 2

3: Speed Table along SW 11th Terrace between SW 16th Avenue and SW 17th Avenue
4: Speed Table along SW 11th Street between SW 16th Avenue and SW 17th Avenue

Group 3

5: Raised intersection at SW 19th Terrace and SW 16th Avenue
6: Speed Table along SW 19th Terrace between SW 16th Avenue and SW 17th Avenue

Group 4

7: Speed Table along SW 24th Road between SW 1st Avenue and SW 2nd Avenue

Group 5

8: Speed Table along SW 9th Street between SW 17th Avenue and SW 16th Avenue
9: Raised intersection at SW 9th Street and SW 16th Avenue
11: Speed Table along SW 17th Street between SW 12th Avenue and SW 13th Avenue

Group 6

10: Speed Table along SW 16th Street between SW 16th Avenue and SW 17th Avenue
12: Raised Intersection at SW 21st Avenue and SW 17th Street (Canceled)

Group 7

13: Speed Table along SW 13th Street between SW 12th Court and SW 13th Avenue

Map illustrating the project boundaries of 40-B243605

Road Closures:

Some road closures will occur during construction but will be sequenced appropriately to minimize disruption to the residents.

Construction Schedule:

The timeline provided is an estimate and may change due to weather conditions or other unforeseen circumstances.

  • Construction Start Date (Group 3 and 5): September 2027
  • Construction End Date (Group 3 and 5): March 2028