Mary Brickell Village Drainage Improvements PH I

Project Number: 40-B30637 – 40-B30833

Current Project Status:

Construction Completed!

Project Scope:

40-B30637: Design and construction of stormwater infrastructure improvements and associated roadway work, including a pump station, drainage wells, milling and resurfacing, and limited roadway reconstruction along streets within Mary Brickell Village.

40-B30833: Curb replacement, ADA ramp improvements, milling and resurfacing, minor drainage.

Project Cost Estimate:

$5,423,619

Project Benefits and Impacts:

  • Alleviate accumulation surface ponding.
  • Newly resurfaced SW 9 Street through SW 12 Street between S Miami Avenue and 1 Avenue.

Project Boundaries:

The project limits are bounded by

  • 40-B30833: SW 1 Avenue between SW 15 Street and SW 7 Street.
  • 40-B30637: SW 9 Street through SW 12 Street between S Miami Avenue and 1 Avenue.

Map indicating 40-B30637 and 40-B30833 Project Boundaries