Mary Brickell Village Drainage Improvements PH II

Project Number: 40-B233821
Current Project Status (December 2025):
Design.
Project Scope:
Design and construction of localized stormwater infrastructure improvements and associated roadway work, including exfiltration trenches, new drainages structures, connections to existing drainage systems, and milling and resurfacing.
Project Cost Estimate:
$2,984,475
Project Boundaries:
The project limits are bounded by
- SE 1 Avenue between SE 9 Street and SE 12 Street
- SW 1 Avenue between SW 11 Street and SW 12 Street
- SW 11 Street between S Miami Avenue and SW 1 Avenue

Road Closures:
Some road closures may occur during construction but will be sequenced appropriately to minimize disruption to the residents.
Construction Schedule:
The timeline provided is an estimate and may change due to weather conditions or other unforeseen circumstances.
- Construction Start: March 2027
- Construction End: September 2027