Mary Brickell Village Drainage Improvements PH II

Miami Forever Bond Logo

Project Number: 40-B233821

Current Project Status (June 2026):

Design.

Project Scope:

Design and construction of localized stormwater infrastructure improvements and associated roadway work, including exfiltration trenches, new drainages structures, connections to existing drainage systems, and milling and resurfacing.

Estimated Costs:

$2,904,926

Project Boundaries:

The project limits are bounded by

  • SE 1 Avenue between SE 9 Street and SE 12 Street.
  • SW 1 Avenue between SW 11 Street and SW 12 Street.
  • SW 11 Street between S Miami Avenue and SW 1 Avenue.

Map illustrating the project boundaries of 40-B233821

Road Closures:

Some road closures may occur during construction but will be sequenced appropriately to minimize disruption to the residents.

Construction Schedule:

The timeline provided is an estimate and may change due to weather conditions or other unforeseen circumstances.

  • Construction Start Date: April 2027
  • Construction End Date: October 2027