SW 15 Road from SW 3 Avenue and SW 11 Street

Project Number: 40-B173619
Current Project Status (June 2026):
Design.
Project Scope:
Traffic study, design and construction of traffic calming, pedestrian safety, roadway and stormwater infrastructure improvements including roadway reconstruction, curbs and gutters, ADA ramps, drainage system, signage and pavement markings, lighting, and landscaping.
Estimated Costs:
$7,306,961
Project Boundaries:
The project limits are bounded by SW 15 Road from SW 3 Avenue to SW 11 Street.
Road Closures:
Some road closures may occur during construction but will be sequenced appropriately to minimize disruption to the residents.
Construction Schedule:
The timeline provided is an estimate and may change due to weather conditions or other unforeseen circumstances.
- Construction Start Date: April 2028
- Construction End Date: April 2029