SW 15 Road from SW 3 Avenue and SW 11 Street

Citizens' Independent Transportation Trust Logo

Project Number: 40-B173619

Current Project Status (November 2025):

Design.

Project Scope:

Traffic study, design and construction of traffic calming, pedestrian safety, roadway and stormwater infrastructure improvements including roadway reconstruction, curbs and gutters, ADA ramps, drainage system, signage and pavement markings, lighting and landscaping.

Project Cost Estimate:

$6,261,725

Project Boundaries:

The project limits are bounded by SW 15 Road from SW 3 Avenue to SW 11 Street.

Map illustrating the project boundaries of 40-B173619

Road Closures:

Some road closures may occur during construction but will be sequenced appropriately to minimize disruption to the residents.

Construction Schedule:

The timeline provided is an estimate and may change due to weather conditions or other unforeseen circumstances.

  • Construction Start: November 2027
  • Construction End: November 2028