SW 15 Road from SW 3 Avenue and SW 11 Street

Project Number: 40-B173619
Current Project Status (September 2025):
Design.
Project Scope:
Traffic study, design and construction of traffic calming, pedestrian safety, roadway and stormwater infrastructure improvements including roadway reconstruction, curbs and gutters, ADA ramps, drainage system, signage and pavement markings, lighting and landscaping.
Project Cost Estimate:
$6,734,239
Project Benefits and Impacts:
- Number of properties impacted: Total = 6 (3 Residential and 3 Non-Residential)
- Total property value protected: $8M
Project Boundaries:
The project limits are bounded by SW 15 Road from SW 3 Avenue to SW 11 Street.

Road Closures:
Some road closures may occur during construction but will be sequenced appropriately to minimize disruption to the residents.
Estimated Construction Timeline:
Subject to change.
- Estimated Construction Start: Fall 2027
- Estimated Construction End: Fall 2028