SW 2 Street Drainage & Roadway Improvements
SW 6 Ave to SW 7 Ave
Status: CONSTRUCTION
Estimated Cost: $90,925
Project No.: 40-B233819
Limits: SW 6 Ave to SW 7 Ave
Why is this project being done?
This project improves roadway conditions and addresses drainage deficiencies along SW 2nd Street through pavement resurfacing, and drainage improvements.
Project Limits Map:

The highlighted segment identifies the limits of the SW 2 Street Drainage & Roadway Improvements Project.
Project Scope:
Construction consists of roadway resurfacing, replacement of damaged curb and gutter sections, and installation of new drainage structures connected to the existing drainage system.
Project Boundaries:
The project extends along SW 2nd Street from SW 6th Avenue to SW 7th Avenue.
Project Benefits:
- Improved drainage
- Reduced roadway flooding
- Enhanced pavement condition
- Improved neighborhood access
Traffic Maintenance During Construction:
Temporary lane restrictions or localized road closures may be required during construction. Access to residences and properties will be maintained whenever possible.
Estimated Construction Timeline:
(Subject to change based on project conditions)
- Estimated Construction Start: November 2026.
- Estimated Construction End: December 2026.
Disclaimer: The timeline provided is an estimate and may be adjusted due to factors such as weather conditions, or other unforeseen circumstances.
What Residents Can Expect
The City is committed to completing this project safely and efficiently while minimizing impacts to the community. During construction, residents may experience temporary lane restrictions, traffic control measures, construction noise, and localized access adjustments. Access to homes and businesses will be maintained whenever feasible, and advance notice will be provided for significant disruptions.
- Access maintained whenever possible
- Temporary traffic control measures
- Improved roadway and drainage infrastructure
- Safe and efficient construction operations