District 4 Traffic Calming Devices Phase II

Project Number: 40-B233607
Current Project Status (September 2026):
Group 6: Design. Please see Project Boundaries section to view each Traffic Control Status.
Project Scope:
Assessment of 37 locations for geometric fit for traffic calming device installations; balloting of acceptable locations; design and construction of traffic calming devices at eligible locations.
Estimated Costs:
$1,170,205
Project Boundaries:
Group 1
48: SW 10 St between SW 22 Ave and SW 23 Ave - Built
49: SW 10 St between SW 17 Ave and SW 18 Ave (D3) - Built
50: SW 10 St between SW 25 Ave and SW 27 Ave - Built
51: SW 12 St between SW 21 Ave and SW 22 Ave (D3) - Built
52: SW 17 St between SW 24 Ave and SW 23 Ave - Built
53: SW 17 St between SW 17 Ave and SW 18 Ave (D3) - Built
54: SW 17 St between SW 37 Ave and SW 36 Ave - Built
Group 2
45: SW 6 St between SW 39 Ave and SW 39 Ct - Built
46: SW 4 St between SW 47 Ave and SW 48 Ave - Built
56: NW 69 Ave between W Flagler St and Tamiami Canal Rd - Built
57: SW 69 Ave between SW 1 St and SW 2 St - Built
58: SW 69 Ave between SW 5 St and SW 5 Ter - Built
59: SW 63 Ave between W Flagler St and SW 2 St - Built
61: SW 63 Ave between SW 2 St and SW 4 St - Built
63: SW 63 Ave between SW 6 St and SW 8 St - Built
Group 3
43A: Tamiami Boulevard between SW 4 St and SW 6 St - Built
67: SW 34 Ave between SW 2 St and SW 3 St - Built
68: SW 34 Ave between SW 4 St and SW 5 St - Not Feasible or Not Concurred
69: SW 34 Ave between SW 6 St and SW 7 St - Built
Group 4
44A: SW 55 Ave Rd between SW 2 St and SW 57 Ave - Built
64: NW 34 Ave between NW 4 Ter and NW 4 St - Not Feasible or Not Concurred
65: NW 34 Ave between NW 4 St and NW 3 St - Not Feasible or Not Concurred
66: NW 34 Ave between NW 2 St and NW 1 St - Not Feasible or Not Concurred
70: SW 33 Ct between SW 18 St and SW 20 St - Built
71: SW 48 Ave Rd between SW 1 St and SW 2 St - Not Feasible or Not Concurred
Group 5
72: NW 6 St between NW 28 Ave and NW 30 Ave - Pending Traffic Study
21: Flagami Blvd between SW 2 St and SW 4 St - Built
Group 6
5: SW 4 Street between SW 72 Avenue and SW 71 Avenue - Design
7: NW 2 Street between NW 66 Avenue and NW 64 Avenue - Design
8: SW 73 Avenue between SW 4 Street and SW 8 Street - Design
9: SW 6 Street between SW 55 Avenue and SW 56 Avenue - Design
17: SW 49 Avenue between W Flagler Street and SW 4 Street - Design
18: SW 49 Avenue between SW 5 Terrace and SW 6 Street - Design
73: SW 52 Court between SW 3 Street and W Flagler Street - Design
74: SW 11 Street between SW 23 Avenue and SW 24 Avenue - Design
75: SW 26 Terrace between SW 35 Avenue and SW 37 Avenue - Design
76: SW 24 Terrace between SW 32 Avenue and SW 34 Avenue - Design
Road Closures:
Some road closures may occur during construction but will be sequenced appropriately to minimize disruption to the residents.
Construction Schedule:
The timeline provided is an estimate and may change due to weather conditions or other unforeseen circumstances.
- Construction Start Date (Group 6): October 2026
- Construction End Date (Group 6): November 2026