NW 5 Street Drainage & Roadway Improvements
NW 30 Place to NW 31 Avenue
Status: CONSTRUCTION
Estimated Cost: $155,485
Project No.: 40-B30262
Limits: NW 30 Place to NW 31 Avenue
Why is this project being done?
This project improves roadway conditions and addresses drainage deficiencies along NW 5th Street through pavement resurfacing, and drainage improvements.
Project Limits Map
The highlighted segment identifies the limits of the NW 5 Street Drainage & Roadway Improvements Project
Project Scope:
Construction includes the installation of a new drainage system, roadway resurfacing with new asphalt, and restoration of adjacent swales
Project Boundaries:
The project extends along NW 5th Street from NW 30th Place to NW 31st Avenue.
Project Benefits
- Improved drainage
- Reduced roadway flooding
- Enhanced pavement condition
- Improved neighborhood access
Traffic Maintenance During Construction
Temporary lane restrictions or localized road closures may be required during construction. Access to residences and properties will be maintained whenever possible.
Estimated Construction Timeline:
(Subject to change based on project conditions)
- Estimated Construction Start: November 2026.
- Estimated Construction End: December 2026.
Disclaimer: The timeline provided is an estimate and may be adjusted due to factors such as weather conditions, or other unforeseen circumstances.
What Residents Can Expect
The City is committed to completing this project safely and efficiently while minimizing impacts to the community. During construction, residents may experience temporary lane restrictions, traffic control measures, construction noise, and localized access adjustments. Access to homes and businesses will be maintained whenever feasible, and advance notice will be provided for significant disruptions.
- Access maintained whenever possible
- Temporary traffic control measures
- Improved roadway and drainage infrastructure
- Safe and efficient construction operations