SW 24 Street from SW 27 Avenue to SW 32 Avenue

This work was funded in part through a grant agreement from the Florida Department of Environmental Protection's Office of Resilience and Coastal Protection Resilient Florida Program. The views, statements, findings, conclusions, and recommendations expressed herein are those of the author(s) and do not necessarily reflect the views of the State of Florida or any of its subagencies.
February 2025.
Project Number: 40-B50413
Current Project Status (January 2026):
Construction Completed!
Project Scope:
Design and construction of right-of-way improvements including driveway approaches, sidewalks, ADA ramps, valley gutters, curbs, drainage system, milling and resurfacing, roadway reconstruction, pavement markings and signage, swale regrading and sodding, and landscaping. This project also includes a Joint Participation Agreement (JPA) with the Miami-Dade Water and Sewer Department (MDWASD) for the installation of an 8-inch watermain, water service connections, and fire hydrants.
Project Cost Estimate:
$8,478,403
Project Boundaries:
The project limits are bounded by
Original: SW 24 Street between SW 27 Avenue and SW 32 Avenue.
Side Streets: SW 31 Avenue between SW 24 Street and SW 25 Street; SW 29 Avenue between SW 24 Terrace and SW 25 Street.

Construction Schedule:
The timeline provided is an estimate and may change due to weather conditions or other unforeseen circumstances.
- Construction Start: Summer 2024
- Construction End: Winter 2025