SW 25 Street from SW 27 Avenue to SW 32 Avenue

Project Number: 40-B50421
Current Project Status:
Construction Completed!
Project Scope:
Design and construction of right-of-way improvements including driveway approaches, sidewalks, ADA ramps, valley gutters, curbs, drainage system, milling and resurfacing, roadway reconstruction, pavement markings and signage, swale regrading and sodding, and landscaping. This project also includes a Joint Participation Agreement (JPA) with the Miami-Dade Water and Sewer Department (MDWASD) for the installation of an 8-inch watermain, water service connections, and fire hydrants.
Project Cost Estimate:
$4,853,136
Project Boundaries:
The project limits are bounded by SW 25 Street between SW 27 Avenue and SW 32 Avenue.

Road Closures:
Some road closures may occur during construction but will be sequenced appropriately to minimize disruption to the residents.