District 5 Traffic Calming

Project Number: 40-B243610
Current Project Status (June 2025):
Planning.
Project Scope:
Design and construction of traffic calming measures at six eligible locations.
Project Cost Estimate:
$1,991,985
Project Benefits and Impacts:
- Number of properties impacted: Total = 543 (380 Residential and 163 Non-Residential)
- Total property value protected: $731M
Project Boundaries:
The project limits are bounded by
Phase I
Group 1
1: NW 6 Ave between NW 44 St and NW 45 St (speed hump)
2: NW 6 Ave between NW 42 St and NW 43 St (speed hump)
3: NW 40 St between NW 5 Ave and NW 6 Ave (speed hump)
Group 2
4: NE 82 Ter and NE 1 Pl (textured pavement)
5: NE 1 Pl between NE 82 St and NE 82 Ter (speed hump) will be included under subdivision improvement.
6: NW 69 St and NW 2 Ave (textured pavement)
7: NW 69 St and NW 2 Ct (textured pavement)
9: NW 69 St and NW 4 Ave (textured pavement)
Group 3
10: NW 50 St between NW 12 Ave and NW 13 Ave (raised crosswalk)
11: NW 50 St and NW 13 Ave (west n/s crosswalk)
12: NW 50 St between NW 13 Ave and NW 14 Ave (speed table)
Group 4
3: Federal Highway between NE 36 St and NE 54 St (scope not yet defined)




Road Closures:
Some road closures may occur during construction but will be sequenced appropriately to minimize disruption to the residents.
Estimated Construction Timeline:
Subject to change.
- Estimated Construction Start (Group 1 and 3): Summer 2025
- Estimated Construction Start (Group 2): July 2026
- Estimated Construction End: Summer 2027