District 5 Traffic Calming

Citizen's Independent Transportation Trust Logo

Project Number: 40-B243610

Project Scope:

Design and construction of traffic calming measures at six eligible locations.

Project Cost Estimate:

$1,000,000

Project Benefits and Impacts:

  • Number of properties impacted: Total = 543 (380 Residential and 163 Non-Residential)
  • Total property value protected: $731M

Project Boundaries:

  • Federal Highway between NE 36 St to NE 54 St
  • NE 1 Pl between NE 82 St and NE 82 Ter
  • NE 82 Ter at NE 1 Pl: Stop bar at NE 1 Pl; Speed Hump along NE 1 Pl between NE 82 Ter and NE 82 St.
  • NW 41 St at NW 10 Ave: All-Way Stop Control (Work to be performed by MDC-DTPW)
  • NW 50 St between NW 12 Ave and NW 15 Ave
  • NW 69 St between NW 2 Ave and NW 5 Ave

Map indicating 40-B243610 Project Boundaries.png

Map indicating 40-B243610 Project Boundaries.png

Road Closures:

Some road closures may occur during construction but will be sequenced appropriately to minimize disruption to the residents.

Estimated Construction Timeline:

  • Estimated Construction Start: Winter 2026
  • Estimated Construction End: Summer 2027

Provide your feedback about this project here