District 5 Traffic Calming

Project Number: 40-B243610
Current Project Status (November 2025):
Group 1: Construction.
Group 2: Design.
Group 3: Construction completed!
Project Scope:
Assessment of twelve (12) locations for traffic calming measures, balloting of applicable locations; design and construction of traffic calming devices at eligible locations.
Project Cost Estimate:
$1,991,985
Project Boundaries:
The project limits are bounded by
Phase I
Group 1
1: NW 6 Ave between NW 44 St and NW 45 St (speed hump)
2: NW 6 Ave between NW 42 St and NW 43 St (speed hump)
3: NW 40 St between NW 5 Ave and NW 6 Ave (speed hump)
Group 2
7: NW 69 St and NW 2 Ct (textured pavement)
9: NW 69 St and NW 4 Ave (textured pavement)
13: NW 69 St and NW 2 Ct (textured pavement)
Group 3
10: NW 50 St between NW 12 Ave and NW 13 Ave (raised crosswalk)
11: NW 50 St and NW 13 Ave (west n/s crosswalk)
12: NW 50 St between NW 13 Ave and NW 14 Ave (speed table)
Group 4
4: NE 82 Ter and NE 1 Pl (textured pavement)
5: NE 1 Pl between NE 82 St and NE 82 Ter (speed hump)
14: Federal Highway between NE 36 St and NE 54 St (scope not yet defined)




Road Closures:
Some road closures may occur during construction but will be sequenced appropriately to minimize disruption to the residents.
Construction Schedule:
The timeline provided is an estimate and may change due to weather conditions or other unforeseen circumstances.
Group 1:
- Construction Start: October 2025
- Construction End: January 2026
Group 2:
- Construction Start: October 2026
- Construction End: March 2027