District 5 Traffic Calming

Citizen's Independent Transportation Trust Logo

Project Number: 40-B243610

Current Project Status (June 2025):

Planning.

Project Scope:

Design and construction of traffic calming measures at six eligible locations.

Project Cost Estimate:

$1,991,985

Project Benefits and Impacts:

  • Number of properties impacted: Total = 543 (380 Residential and 163 Non-Residential)
  • Total property value protected: $731M

Project Boundaries:

The project limits are bounded by 

Phase I

Group 1

1: NW 6 Ave between NW 44 St and NW 45 St (speed hump)
2: NW 6 Ave between NW 42 St and NW 43 St (speed hump)
3: NW 40 St between NW 5 Ave and NW 6 Ave (speed hump)

Group 2

4: NE 82 Ter and NE 1 Pl (textured pavement)
5: NE 1 Pl between NE 82 St and NE 82 Ter (speed hump) will be included under subdivision improvement.
6: NW 69 St and NW 2 Ave (textured pavement)
7: NW 69 St and NW 2 Ct (textured pavement)
9: NW 69 St and NW 4 Ave (textured pavement)

Group 3

10: NW 50 St between NW 12 Ave and NW 13 Ave (raised crosswalk)
11: NW 50 St and NW 13 Ave (west n/s crosswalk)
12: NW 50 St between NW 13 Ave and NW 14 Ave (speed table)

Group 4

3: Federal Highway between NE 36 St and NE 54 St (scope not yet defined)

Map indicating 40-B243610 Project Boundaries

Map indicating 40-B243610 Project Boundaries

Map indicating 40-B243610 Project Boundaries

Map indicating 40-B243610 Project Boundaries

Road Closures:

Some road closures may occur during construction but will be sequenced appropriately to minimize disruption to the residents.

Estimated Construction Timeline:

Subject to change.

  • Estimated Construction Start (Group 1 and 3): Summer 2025
  • Estimated Construction Start (Group 2): July 2026
  • Estimated Construction End: Summer 2027

Provide your feedback about this project here