NE 3 Avenue from NE 54 Street to NE 59 Street

Citizens' Independent Transportation Trust Logo

Project Number: 40-B50906

Current Project Status (September 2025):

Design.

Project Scope:

Design and construction of roadway and drainage improvements including roadway reconstruction, swale reconstruction, sidewalk repairs, ADA ramps, drainage system, and pavement markings.

Project Cost Estimate:

$3,259,046

Project Benefits and Impacts:

  • Number of properties impacted: Total = 32 (14 Residential and 18 Non-Residential)
  • Total property value protected: $14M

Project Boundaries:

The project limits are bounded by NE 3 Avenue from NE 54 Street to NE 59 Street.

Map illustrating the project boundaries of 40-B50906

Road Closures:

Some road closures may occur during construction but will be sequenced appropriately to minimize disruption to the residents.

Estimated Construction Timeline:

Subject to change.

  • Estimated Construction Start: Winter 2026
  • Estimated Construction End: Winter 2027