Miami River Greenway Curtis Park East

Citizen's Independent Transportation Trust Logo

Project Number: 40-B183603

Current Project Status:

Design, 100% production plans to be submitted by June 2025.

Project Scope:

Design and construction of a greenway and associated right-of-way improvements including roadway reconstruction, milling and resurfacing, sidewalks, ADA ramps, drainage system, and lighting in accordance with the Miami River Greenway Master Plan.

Project Phases:

Phase I - The intent of this phase is to remove NB Pavement, Reconstruct NB Lane, Curb and Gutter, Shoulder, Sidewalk and construct new drainage.

Phase II - The intent of this phase is to remove SB Pavement, Reconstruct SB Lane, Curb and Gutter, Shoulder, Sidewalk and construct new drainage.

Phase III - The intent of this phase is to construct overlay, curb and gutter along NW 24th Ave and Miami River Greenway. This phase is done in two steps with flagger. Step 1 Construct Sidewalk, Curb and Gutter up to Stadium along NW 24th Ave and Detour the pedestrian traffic along the Miami River Greenway from the sidewalk on the southside. After the North side sidewalk is construct. Shift the pedestrians to the newly constructed sidewalk and construct rest of the sidewalk along the south side.

Phase IV - The intent of this phase is to install Friction Course and Pavement Marking.

Project Cost Estimate:

$5,757,370

Project Benefits and Impacts:

  • Number of properties impacted: Total = 12 (2 Residential and 10 Non-Residential)
  • Total property value protected: $30M

Project Boundaries:

The project limits are bounded byNW North River Drive between NW 22 Avenue and NW 24 Avenue.

Map indicating 40-B183603 Project Boundaries

Road Closures:

Some road closures will occur during construction but will be sequenced appropriately to minimize disruption to the residents.

Estimated Construction Timeline:

Subject to change.

  • Estimated Construction Start: Winter 2026
  • Estimated Construction End: Winter 2027

MRG at Curtis Park 1

Click here to download the April 22nd, 2022 Community Meeting Presentation(PDF, 2MB)

Additional Traffic Signs Throughout the Project

MRG at Curtis Park Traffic Signs Map
Provide your feedback about this project here