NW 30 Street Improvement

Project Number: 40-B30756
Current Project Status (January 2026):
Construction.
Project Scope:
Design and construction of right-of-way improvements including roadway reconstruction, milling and resurfacing, drainage, swale reconstruction, sidewalk repairs, ADA ramps, signing and pavement markings. This project also includes a Joint Participation Agreement (JPA) with Miami-Dade Water and Sewer (MDWASD) for the installation of an 8-inch water main, fire hydrants, and water services along NW 30 Street between NW 17 Avenue and NW 12 Avenue.
Project Cost Estimate:
$6,300,922
Project Boundaries:
The project limits are bounded by NW 30 Street between NW 17 Avenue and NW 12 Avenue.

Road Closures:
Some road closures will occur during construction but will be sequenced appropriately to minimize disruption to the residents.
Construction Schedule:
The timeline provided is an estimate and may change due to weather conditions or other unforeseen circumstances.
- Construction Start: September 2025
- Construction End: September 2026