NW 30 Street Improvement

Citizen's Independent Transportation Trust Logo

Project Number: 40-B30756

Current Project Status (September 2025):

Construction.

Project Scope:

Design and construction of right-of-way improvements including roadway reconstruction, milling and resurfacing, drainage, swale reconstruction, sidewalk repairs, ADA ramps, signing and pavement markings. This project also includes a Joint Participation Agreement (JPA) with Miami-Dade Water and Sewer (MDWASD) for the installation of an 8-inch water main, fire hydrants, and water services along NW 30 Street between NW 17 Avenue and NW 12 Avenue.

Project Cost Estimate:

$6,300,922

Project Benefits and Impacts:

  • Number of properties impacted: Total = 77 (33 Residential and 44 Non-Residential)
  • Total property value protected: $36M

Project Boundaries:

The project limits are bounded by NW 30 Street between NW 17 Avenue and NW 12 Avenue.

Map illustrating the project boundaries of 40-B30756

Road Closures:

Some road closures will occur during construction but will be sequenced appropriately to minimize disruption to the residents.

Estimated Construction Timeline:

Subject to change.

  • Estimated Construction Start: Summer 2025
  • Estimated Construction End: Summer 2026