East Flagami Flood Mitigation (Pump Station)

Miami Forever Bond Logo Florida Department of Environmental Protection Logo

This work was funded in part through a grant agreement from the Florida Department of Environmental Protection's Office of Resilience and Coastal Protection Resilient Florida Program. The views, statements, findings, conclusions, and recommendations expressed herein are those of the author(s) and do not necessarily reflect the views of the State of Florida or any of its subagencies.
August 2023.

Project Number: 40-B223801

Click here to download the District 4 Industry Day Presentation(PDF, 1MB)

Current Project Status (November 2025):

Design Build Procurement.

Project Scope:

Design-Build of stormwater infrastructure and associated roadway improvements including new and upsized stormwater inlets and pipes, exfiltration trenches, stormwater pump station with injection wells, roadway reconstruction, milling and resurfacing, ADA ramps, signage and pavement markings. Pump station at intersection of SW 37 Ave and NW 4 St.

Project Cost Estimate:

$80,137,359

Project Benefits and Impacts:

The project will help alleviate localized flooding experienced by the community.

  • Number of properties impacted: Total = 765 (553 Residential and 212 Non-Residential)
  • Total property value protected: $478M

Project Boundaries:

The project limits are bounded by

Auburndale – District 4

  • NW 4 St between NW 32 Ave and 37 Ave
  • NW 36 Ct between NW 4 St and NW 2 Ter
  • NW 2 Ter between NW 36 Ct and NW 37 Ave

Flagami – District 4

  • NW 2 Ter between NW 38 Ct and NW 40 Ave
  • NW 3 St between NE 36 Ct and NW 42 Ave
  • NW 4 St between NW 38 Ct and NW 42 Ave
  • NW 4 Ter between NW 38 Ct and NW 42 Ave
  • NW 5 St between NW 38 Ct and NW 42 Ave
  • NW 6 St between NW 38 Ct and NW 42 Ave
  • NW 38 Ct between NW 2 Terr and NW 7 St
  • NW 39 Ave between NW 2 Terr and NW 7 St
  • NW 40 Ave between NW 3 St and NW 2 Terr
  • NW 40 Ct between NW 2 St and NW 7 St
  • NW 41 Ave between NW 2 St and NW 3 St

Map illustrating the project boundaries of 40-B223801

Road Closures:

Some road closures will occur during construction but will be sequenced appropriately to minimize disruption to the residents.

Construction Schedule:

The timeline provided is an estimate and may change due to weather conditions or other unforeseen circumstances.

  • Construction Start: July 2026
  • Construction End: November 2027

East Flagami Paving Road Drainage and Swale
Click here to download the pdf version of the image above.(PDF, 1MB)

East Flagami Project Details

You may view the above image here: East-Flagami.jpg(JPG, 162KB)