Tamiami Canal Blvd Improvement Project

Citizens' Independent Transportation Trust Logo

Project Number: 40-B243600

Current Project Status (November 2025):

Phase 1: Construction Completed!
Phase 2: Design.

Project Scope:

Design and construction of right-of-way improvements including roadway reconstruction, milling and resurfacing, drainage system, 8-inch water main, water services, fire hydrants, sidewalks, valley gutters, curbs and gutters, driveway approaches, on-street parking, ADA ramps, pavement markings and signage, landscaping, and lighting.

Project Phases:

Phase I: Watermain extension and roadway improvements in front and in rear of Badia Center.

Phase II: Roadway and drainage improvements for the remaining project.

In-House: SW 72nd Avenue from SW 4th Street to Tamiami Blvd.

Project Cost Estimate:

$7,215,420 

Project Boundaries:

The project limits are bounded by

  • SW 71 Avenue between Flagler Street and SW 4 Street
  • Tamiami Boulevard between SW 71 Avenue and SW 72 Avenue
  • SW 3 Street between SW 71 Avenue and SW 72 Avenue

Map illustrating the project boundaries of 40-B243600

Road Closures:

Some road closures may occur during construction but will be sequenced appropriately to minimize disruption to the residents.

Construction Schedule:

The timeline provided is an estimate and may change due to weather conditions or other unforeseen circumstances.

  • Construction Start (Phase II): TBD
  • Construction End (Phase II): TBD