S. Bayshore Ln. & Fairview St. Roadway Improvements & New Pump Station

Project Number: 40-B30737
Click the tab below to view the South Bay Shore Lane Pump Station (Phase II) Presentation, shared at the May 16th, 2024 community meeting.
South Bayshore Lane Pumpstation - May 16th, 2024, Community Presentation
Current Project Status (January 2026):
Phase I completed December 2020.
Phase II Pre-Construction. Construction commencement is anticipated to begin once all utility relocations are completed, tentatively by end of February 2026.
Project Scope:
Phase I - includes roadway and drainage improvements on South Bayshore Lane and East/West Fairview Street. The scope of work includes the following: roadway reconstruction, drainage improvements including a new watermain line replacement (done jointly with the Miami-Dade Water and Sewer Department), damaged sidewalk replacement, repair of driveway approaches, swale restoration, pavement marking, signage, and ADA ramps.
Phase II - Design and construction of new stormwater pump station with a raised platform, two gravity drainage wells, a SCADA system, and upgrade to an existing outfall.
Project Cost Estimate:
$12,420,228
Project Benefits and Impacts:
The project will help alleviate localized flooding experienced by the community.
- Number of properties impacted: Total = 96 (92 Residential and 4 Non-Residential)
- Total property value protected: $118M
Pump Station Location & Rendering:



Construction Schedule:
The timeline provided is an estimate and may change due to weather conditions or other unforeseen circumstances.
- Construction Start: Spring 2026
- Construction End: Spring 2027