Mary Brickell Village Drainage Improvements PH II

Miami Forever Bond Logo

Project Number40-B233821

Current Project Status (June 2025):

Design. Next 60% plans by mid-June 2025.

Project Scope:

Design and construction of localized stormwater infrastructure improvements and associated roadway work, including exfiltration trenches, new drainages structures, connections to existing drainage systems, and milling and resurfacing.

Project Cost Estimate:

$1,616,006

Project Benefits and Impacts:

  • Number of properties impacted: Total = 1999 (1901 Residential and 98 Non-Residential)
  • Total property value protected: $1B

Project Boundaries:

The project limits are bounded by

SE 1 Avenue between SE 9 Street and SE 12 Street.
SW 11 Street between SW 1st Avenue and S Miami Avenue.

Map indicating 40-B233821 Project Boundaries

Road Closures:

Some road closures may occur during construction but will be sequenced appropriately to minimize disruption to the residents.

Estimated Construction Timeline:

Subject to change.

  • Estimated Construction Start: Summer 2026
  • Estimated Construction End: Winter 2027