Mary Brickell Village Drainage Improvements PH II

Project Number: 40-B233821
Current Project Status (June 2025):
Design. Next 60% plans by mid-June 2025.
Project Scope:
Design and construction of localized stormwater infrastructure improvements and associated roadway work, including exfiltration trenches, new drainages structures, connections to existing drainage systems, and milling and resurfacing.
Project Cost Estimate:
$1,616,006
Project Benefits and Impacts:
- Number of properties impacted: Total = 1999 (1901 Residential and 98 Non-Residential)
- Total property value protected: $1B
Project Boundaries:
The project limits are bounded by
SE 1 Avenue between SE 9 Street and SE 12 Street.
SW 11 Street between SW 1st Avenue and S Miami Avenue.

Road Closures:
Some road closures may occur during construction but will be sequenced appropriately to minimize disruption to the residents.
Estimated Construction Timeline:
Subject to change.
- Estimated Construction Start: Summer 2026
- Estimated Construction End: Winter 2027