South Golden Pines No Outlet Streets Improvements

Project Number: 40-B173613
Current Project Status (February 2026):
Design.
Project Scope:
Design and construction of right-of-way improvements including driveway approaches, sidewalks, ADA ramps, valley gutters, curbs, drainage system, milling and resurfacing, roadway reconstruction, pavement markings and signage, swale regrading and sodding. This project requires securing perpetual easements for new sidewalks. This project also includes a Joint Participation Agreement (JPA) with the Miami-Dade Water and Sewer Department (MDWASD) for the installation of an 8-inch watermain, water service connections, and fire hydrants.
Project Phases:
Phase 1 - SW 31 Pl, SW 31 Ct, SW 31 Ave, SW 30 Ct and SW 30 Ave, North of SW 27 St.
Phase 2 - SW 27 Ct, SW 28 Ave, SW 28 Ct, SW 29 Ct, South of SW 27 St.
Phase 3 - Easements Required: SW 29 Pl, SW 29 Ct, SW 29 Ave, SW 28 Ct, SW 28 Ave, SW 27 Ct, North of SW 27 St.
Project Cost Estimate:
$10,817,382
Project Boundaries:
The project limits are bounded by
Original
No outlet streets North of SW 27 St between SW 27 Ave and SW 32 Ave (SW 27 Ct, SW 28 Ave, SW 28 Ct, SW 29 Ave, SW 29 Ct, SW 29 Pl, SW 30 Ave, SW 30 Ct, SW 31 Ave, SW 31 Ct, and SW 31 Pl).
Additional
No outlet streets South of SW 27 St between SW 27 Ave and SW 32 Ave (SW 27 Ct, SW 28 Ave, SW 28 Ct, SW 29 Ct).
Road Closures:
Some road closures may occur during construction but will be sequenced appropriately to minimize disruption to the residents.
Construction Schedule:
The timeline provided is an estimate and may change due to weather conditions or other unforeseen circumstances.
- Construction Start: March 2027
- Construction End: March 2028