East Flagami Neighborhood Flood Improvements


This work was funded in part through a grant agreement from the Florida Department of Environmental Protection's Office of Resilience and Coastal Protection Resilient Florida Program. The views, statements, findings, conclusions, and recommendations expressed herein are those of the author(s) and do not necessarily reflect the views of the State of Florida or any of its subagencies.
August 2023.
Project Number: 40-B223801
Click here to download the District 4 Industry Day Presentation(PDF, 1MB)
Current Project Status:
Design/Bidding.
Project Scope:
Design-Build of stormwater infrastructure and associated roadway improvements including new and upsized stormwater inlets and pipes, exfiltration trenches, stormwater pump station with injection wells, roadway reconstruction, milling and resurfacing, ADA ramps, signage and pavement markings. This project also includes a requested Joint Participation Agreement (JPA) with Miami-Dade Water and Sewer Department (MDWASD) for water main system betterments.
Project Cost Estimate:
$70,497,876
Project Benefits and Impacts:
The project will help alleviate localized flooding experienced by the community.
- Number of properties impacted: Total = 765 (553 Residential and 212 Non-Residential)
- Total property value protected: $478M
Project Boundaries:
The project limits are bounded by
Flagami – District 4
NW 2 Ter between NW 38 Ct and NW 40 Ave.
NW 3 St between NE 36 Ct and NW 42 Ave.
NW 4 St between NW 38 Ct and NW 42 Ave.
NW 4 Ter between NW 38 Ct and NW 42 Ave.
NW 5 St between NW 38 Ct and NW 42 Ave.
NW 6 St between NW 38 Ct and NW 42 Ave.
NW 38 Ct between NW 2 Terr and NW 7 St.
NW 39 Ave between NW 2 Terr and NW 7 St.
NW 40 Ave between NW 3 St and NW 2 Terr.
NW 40 Ct between NW 2 St and NW 7 St.
NW 41 Ave between NW 2 St and NW 3 St.
Auburndale – District 4
NW 4 St between NW 3 St and NW 4 St.
NW 4 St between NW 36 Ct and NW 32 Ave.
NW 32 Ave between NW 4 St and NW 7 St.
South Grapeland Heights – District 1
NW 32 Ave between NW 7 St and NW 11 St.
NW 11 St between NW 32 Ave and NW 27 Ave.
NW 29 Ave between NW 11 St and NW 12 St.

Road Closures:
Some road closures will occur during construction but will be sequenced appropriately to minimize disruption to the residents.
Estimated Construction Timeline:
Subject to change.
- Estimated Construction Start: Winter 2026
- Estimated Construction End: Winter 2028

Click here to download the pdf version of the image above.(PDF, 1MB)

You may view the above image here: East-Flagami.jpg(JPG, 162KB)
Provide your feedback about this project here